sreda, 16. november 2011

25-xxx

Console maintenance is done!

In the last days we were working on changing smaller bits on the console like converting lamps to LED and some other smaller problems that we had on the channels and master module.But now the hard work is done, the console still misses all the back, bottom and side panels that will put them on in next days as we need to finish some other work in the other studio rooms.

There you can see the LAMP to LED modification, we have done almost the same thing on all switches;)


Master section... cheking if evrything is ok ;)

ponedeljek, 7. november 2011

Day 22-24

... back to the cleaning..,

Day 22:
The SSL G computer before cleaning....


And after the cleaning!


The PSU before cleaning, (i forgot to took the pictures when cleaned, will do it later as we have to change the fans.)


And the SSL Rack...


Day 23: the computer connected to the console with all the cables and tested, seems to be working fine, still need to try the Total recall but need to get a RGB to VGA converter before ;)

Day 24: all the channels fitted in the console and working, there are still some small things to be fixed, all the faders cleaned...

Day 19 - 21

In this days we didnt work on the console... there was a lot of work in the machine room, putting all new multicores on rows and we had to pack our old console for the shipping to the client.

so thats it for that days.... ,)